Production Management Flow Chart
1
Injection Mould
Integrated-form injected by fully computerized injector.
2
Incoming Quality Control
To assure material quality, products and components are particularly tested by precision facilities.
3
Automatic Assembly
Normalizing production by automatic assembly machine.
4
Computer Jet Printing
To be responsible to our production, all ceramic cartridges are jet printed with brand name, model and manufactured date.
5
Process Inspection
With the process inspection to modify the problems in time.
6
FQC 100 % Air Test
Performing the air test for every ceramic cartridge.
7
Function Test

Introduce the imported life testing machine, rupture tester, high temp pressure machine and intermittent shock tester. All the testing standard is in compliance with ASME A112.18.1-2005/CSA B125.1-05, EN817, AS NZS 3718:2005.

8
Package
Packaging standard according to QC engineering program and suit for long distance transportation.
9
In Stock
Store the finished products according to the different model and lot number.
10
Shipment
All delivery process is performed with strict management.